PROJECT DETAILS (SSI UNIT)

1.

Installed capacity

4000 sq. m per day (4 mm basis)

2.

Land & Building

 

 

- Land

10,000 sq.m

 

- Building

1250 sq.m

3.

Capital Investment

 

 

- Machineries

75 lakh

 

- Equipments

25 lakh

 

- Raw Materials

45 lakh

4.

Raw Material Requirement
(300 working days in a year)

 

 

- Bamboo mat

5244800 sq.m

 

- Veneer (2'5 mm)

3576000 sq.m

 

- Face (0.6 mm)

2384000 sq.m

5.

Energy requirement

 

 

- Electricity

800 KW/Shift

 

- Water

As per requirement

 

- Steam

- Do -

6.

Man Power

 

 

- Managerial

4

 

- Foreman

3

 

- Labour

40

7.

Raw material cost for the products
(Bamboo mat, veneer & Resin)

Rs. 290.00 per m2 of 15 mm board.
Rs. 205.00 per m2 of 12 mm board.

 

 

 

 

Machineries

 

Equipment

1.

Hot Press

1.

Scissor lifter

2.

Glue Spreader

2.

Conveyer

3.

Glue Application

3.

Trolley

4.

Dryer or Drying Chamber

4.

Measuring equipments

5.

Boiler

5.

Air compressor

6.

DD Saw

6.

Blower for cooling aluminium cauls

7.

Sander

7.

Aluminium cauls

8.

Generator

8.

Storage tank for chemicals

9.

Resin Plant

9.

Resin Plant