PROJECT DETAILS (SSI UNIT) |
||
|
1. |
Installed capacity |
4000 sq. m per day (4 mm basis) |
|
2. |
Land & Building |
|
|
|
|
10,000 sq.m |
|
|
|
1250 sq.m |
|
3. |
Capital Investment |
|
|
|
|
75 lakh |
|
|
|
25 lakh |
|
|
|
45 lakh |
|
4. |
Raw Material
Requirement |
|
|
|
|
5244800 sq.m |
|
|
|
3576000 sq.m |
|
|
|
2384000 sq.m |
|
5. |
Energy requirement |
|
|
|
|
800 KW/Shift |
|
|
|
As per requirement |
|
|
|
- Do - |
|
6. |
Man Power |
|
|
|
|
4 |
|
|
|
3 |
|
|
|
40 |
|
7. |
Raw material cost
for the products |
Rs. 290.00 per m2 of
15 mm board. |
|
|
|
|
|
Machineries |
|
Equipment |
|
|
1. |
Hot Press |
1. |
Scissor lifter |
|
2. |
Glue Spreader |
2. |
Conveyer |
|
3. |
Glue Application |
3. |
Trolley |
|
4. |
Dryer or Drying Chamber |
4. |
Measuring equipments |
|
5. |
Boiler |
5. |
Air compressor |
|
6. |
DD Saw |
6. |
Blower for cooling aluminium cauls |
|
7. |
Sander |
7. |
Aluminium cauls |
|
8. |
Generator |
8. |
Storage tank for chemicals |
|
9. |
Resin Plant |
9. |
Resin Plant |